Miter & Mason Kitchen & Bath
(201) 555-0184 Book a free call

Ridgewood, NJ · NJ HIC #13VH09428700

A-000 Kitchen & bath Ridgewood, New Jersey Est. 2009

Kitchens and baths that finish on time.

96% finished on the week we quoted

A finished white inset kitchen with a marble-topped island, open shelving and pendant lighting

Miter & Mason takes fourteen projects a year. We draw them, mill them in the shop on Chestnut Street, and the crew that opens your wall is the crew that hands you the keys.

A-101

What we do

Six things, done properly
A-201

How a project runs

15 weeks, typical kitchen

Nothing comes down until everything is on site.

Every cabinet, slab, tile, fixture and appliance is delivered to the shop and inspected before the first wall is opened. It is the least glamorous rule we have and it is the reason ninety-six percent of our jobs finish on the week we quoted.

Read the full sequence
  1. 00

    The first call

    45 minutes · No charge

    A real conversation about the room, the house, and the number. If what you want and what you want to spend do not meet, you find that out now rather than after you have paid us a design fee.

  2. 01

    Site visit

    Week 0 · No charge

    We measure the room properly, work out which way the floor structure runs and what it can carry, check whether your electrical panel has room for what you want, and find where the pipes and ducts actually are. Half of what makes a remodel expensive is decided in this hour.

  3. 02

    Design and drawings

    Weeks 1 to 4 · Design fee, credited back

    A floor plan, a drawing of every wall, and a measured drawing of every run of cabinets. Three rounds of changes are included. You approve real drawings rather than a glossy 3D render, because a render will not tell you there is a three inch filler panel beside your fridge.

  4. 03

    Choosing and ordering

    Weeks 3 to 8 · Budgets agreed

    Every appliance, stone slab, tile, tap and light fitting chosen, ordered, delivered and checked. You see the actual slab at the yard and we tag it as yours. Tile is ordered from one batch with fifteen percent spare, so a broken one later still matches.

  5. 04

    Permits

    Weeks 4 to 7 · At cost

    Building, plumbing, electrical and fire where required, filed with your town under our licence and our trades' licences. We do not start work on a permit we have not had back in our hands.

  6. 05

    Demolition and the hidden work

    Weeks 8 to 10 · Second payment

    A sealed dust wall with a zip door, an air scrubber pulling dust out of the room rather than into your house, and floor protection along the whole route the crew walks. Framing, plumbing, electrical and heating, then inspections before anything is closed up.

  7. 06

    Finishing

    Weeks 10 to 14 · Third payment

    Cabinets set and cut to fit the walls, then the stone measured off the cabinets that are actually installed rather than off a drawing, which is why the counters fit. Then tile, paint, trim, fixtures and lighting.

  8. 07

    Final walkthrough

    Week 15 · Final payment

    You walk the room and write down everything that is not right. We work through that list for ten days. Then you get a binder with the warranties, the paint codes, the tile batch numbers, and a drawing of what is actually behind your walls.

A-301

Projects

Six of two hundred and fourteen
  1. A-301.1 Center Hall, Opened Ridgewood · 2025 Kitchen + Dining 14 wk White inset kitchen with a navy herringbone backsplash and a cooktop set into a waterfall quartz island
  2. A-301.2 Curbless on 2x8s Montclair · 2025 Primary Bath 9 wk Curbless walk-in shower in honed grey porcelain beside a long double vanity in a bright bathroom
  3. A-301.3 Under a Seven-Eleven Ceiling Glen Rock · 2024 Kitchen + Pantry 16 wk Kitchen with stained white oak perimeter cabinets and a deep blue painted island under pendant lights
  4. A-301.4 Thirty Inches of Dead Hallway Ho-Ho-Kus · 2024 Butler’s Pantry + Bar 7 wk Dark painted butler’s pantry cabinetry with an arched glass door leading to a dining room
  5. A-301.5 A Galley That Stays a Galley Wyckoff · 2024 Kitchen 11 wk Two-tone galley kitchen with white oak cabinets on one wall and charcoal cabinets on the other
  6. A-301.6 One Slab, Ten Feet Eight Saddle River · 2023 Kitchen + Mudroom 15 wk Large charcoal kitchen island with a marble top, pendant lights above, open to a family room

See all projects

A-401

How we work

How we are different to work with
  • Nothing is demolished early

    Every cabinet, slab, fixture, tile and appliance is on site and inspected before the first wall comes down. This single rule is why our jobs finish on the week we said.

  • One job at a time, per crew

    Fourteen projects a year across two crews. Your lead carpenter is on your site every day it is open, and it is the same person from the first day to the last.

  • Permits, always

    Every structural, plumbing and electrical change is filed and inspected. Unpermitted work becomes your problem at closing, and we will not hand you that.

  • Fixed price, written allowances

    A line-item contract with named allowances for stone, tile and fittings. Change orders are priced and signed before the work happens, never after.

  • Gaps you cannot see

    The gaps around every door and drawer are held to a sixteenth of an inch. It sounds like a small thing. It is the difference you notice from across the room without knowing why.

  • Three-year workmanship warranty

    Three years on our labour, on top of whatever the manufacturer covers. We answer the phone in year three.

A-501

What owners say

What the owners said afterwards
  • We interviewed four builders. Miter & Mason was the only one who came back with a drawing of the header and a note about the footing. The other three came back with a number.

    Homeowner · Ridgewood, NJ · Kitchen, 2025

  • Fifteen weeks, and we knew at the start of each one what was happening in it. I have renovated three houses. This does not normally happen.

    Homeowner · Saddle River, NJ · Kitchen and mudroom, 2023

  • My final list was eleven items and nine of them were me being fussy. They fixed all eleven in six days and did not sigh once.

    Homeowner · Montclair, NJ · Primary bath, 2025

A-601

Tell us about your project

45 minutes · No charge

Tell us the room and the number. We will tell you if they meet.

Most of a remodel is decided before anyone picks up a tool. Forty-five minutes on the phone is usually enough to know whether the brief and the budget are in the same building, and it costs you nothing to find out.

  1. 01

    You call or send the form. We answer within one business day.

  2. 02

    Forty-five minutes on the phone: the room, the house, the timeline, and an honest range.

  3. 03

    If it fits, we come and measure. If it does not, we tell you who does this kind of work well.