Projects A-301.2

Curbless on 2x8s

A 1980s tub and a linen closet became one shower with nothing to step over. The floor underneath had to be rebuilt to make it drain.

Location
Montclair, NJ
House
1912 American four-square
Room
11'-0" x 8'-2"
Scope
Primary Bath
On site
9 weeks
Range
$96k to $118k
Curbless walk-in shower in honed grey porcelain beside a long double vanity in a bright bathroom
A-301.2 Curbless on 2x8s, Montclair Completed 2025
.01

What they wanted

What was asked for

One of the owners had a knee replacement booked for the following spring. They wanted a shower with nothing to step over, in a 1912 house whose floor was never going to make that easy.

.02

What we did

3 interventions
  1. 01

    Build the floor up, do not cut it down

    Cutting the joists to make room for the drain would have taken structure out of a floor that has carried a bathroom for a century. Instead we added a sister joist and raised the whole bathroom floor an inch and a half on tapered timbers, building the slope to the drain into that build-up. The ceiling below was never opened.

  2. 02

    The waste pipe moved fourteen inches

    The old cast iron stack was cut, joined to modern pipe with shielded couplings, and shifted fourteen inches to clear the new drain. Vented to code and signed off by the inspector before anything was closed up.

  3. 03

    Waterproofed, then proved

    A sealed membrane covers every surface the water can reach, including the ceiling, with every seam banded. Then we plugged the drain, filled the pan, marked the waterline and came back a day later to read it. Both photographs are in the handover binder.

The second floor landing outside the bath
The second floor landing outside the bath
.03

What it is built from

Every material, named
Shower walls 24x48 honed porcelain, stacked, 1/16" joint
Field walls 3x12 glazed ceramic, running bond
Waterproofing Schluter-KERDI, KERDI-BAND, KERDI-LINE 36" wall drain
Floor heat Ditra-Heat with Nuheat Signature thermostat
Fittings Kohler Purist, unlacquered brass, thermostatic
Glass 1/2" low-iron, single fixed panel, no header
Vanity Shop-built white oak, 84", wall hung, integrated sinks

Programme, 9 weeks

  1. Design and selections weeks 1 to 3
  2. Permits, Township of Montclair weeks 3 to 5
  3. Procurement complete week 5
  4. Demo and framing week 6
  5. Plumbing and electrical rough, inspection week 7
  6. Waterproofing and flood test week 7
  7. Tile, glass template, trim weeks 8 to 9

Nine weeks, quoted, and nine weeks it was. We had the surgery date on the calendar and the bathroom was done sixteen days before it.

Homeowner · Montclair, NJ · Primary Bath, 2025
A-601

Tell us about your project

45 minutes · No charge

Tell us the room and the number. We will tell you if they meet.

Most of a remodel is decided before anyone picks up a tool. Forty-five minutes on the phone is usually enough to know whether the brief and the budget are in the same building, and it costs you nothing to find out.

  1. 01

    You call or send the form. We answer within one business day.

  2. 02

    Forty-five minutes on the phone: the room, the house, the timeline, and an honest range.

  3. 03

    If it fits, we come and measure. If it does not, we tell you who does this kind of work well.